# Quantity-based scheduling

Learn how to calculate work package durations from quantities and productivity rates using the bill of quantities or Gantt columns.

Language: en
Canonical: https://support.sitedrive.com/en/kb/quantity-based-scheduling

> **Availability:** This feature is switched on separately for each account. If you can't see it, contact Sitedrive support.

With quantity-based scheduling, Sitedrive calculates how long work takes from how much there is to do. You enter quantities, such as 1,200 m² of drywall partitions, and a rate for how many hours each unit takes. Sitedrive then calculates the work amount and duration of the work package. When rates or quantities change, the schedule updates with them.

You can work in two ways:

-   **In Gantt:** type quantities directly into columns on each work package. Quick for a few work packages.
-   **From the bill of quantities:** import a quantity list, create tasks from it, and link them to work packages. Best for a full project.

## Before you start

-   You need the **Schedule**, **Site** or **Account admin** right to change quantities.
-   Your work packages should already exist. See [Work packages](https://support.sitedrive.com/en/kb/work-packages).
-   To divide quantities by floor area, enter floor areas for your spaces in the [space model](https://support.sitedrive.com/en/kb/building-the-space-model).

## Enter quantities in Gantt

1.  In **Gantt**, select **Columns** in the toolbar.
2.  In the **Quantity** group, tick the columns you need: **Quantity name**, **Amount**, **Man-hour rate**, **Productivity rate** and **Work group size**.
3.  On a work package row, enter the quantity name and amount.
4.  Adjust the rates if needed.

The work package's duration and work amount update from the values. If the work package is already placed in areas, the total is divided between the areas.

## Use the bill of quantities

1.  Open **Schedule settings** (the gear icon) and select **Bill of quantities**.
2.  Select **Import** and drop your .xlsx file.
3.  Map your file's columns to **Code**, **Name**, **Amount** and **Unit**, and choose the first row to import.
4.  Review the data and select **Import quantities**.

You can also add rows by hand with **Add**.

![Bill of quantities page in schedule settings with Add, Delete and Import buttons, and the side panel for assigning tasks to work packages](https://support.sitedrive.com/media/help/guide/quantity-based-scheduling/01-bill-of-quantities.webp)

Then turn quantities into scheduled work:

1.  Select one or more quantity rows.
2.  In the side panel **Tasks** tab, create a task. Enter a name, the work cost (hours per unit), man-hour rate and company.
3.  In the **Spaces** tab, assign the quantity to spaces. Choose to divide the amount **Equally** or **By surface area**.
4.  Assign the task to a work package. Select it in the **Work packages** tab (**Assign tasks to work packages**).

The work package's duration is now calculated from the linked quantities.

## Good to know

-   Work amount on a quantity-based work package is read-only. Change the quantity or the rates instead.
-   If you change a total amount, Sitedrive offers to redistribute it across the areas. This overwrites amounts you set per area.
-   You can't edit a quantity in a view that doesn't include all of its spaces. Use [Define areas](https://support.sitedrive.com/en/kb/define-areas) instead.
-   Define areas on a work package with quantities opens a quantity assignment dialog instead of the normal drawer.
-   A single task can't be longer than 40,000 hours.
-   If you delete quantity rows with linked tasks, the tasks are removed from their work packages. You can choose to also delete work packages left without tasks.
-   The import doesn't support merged cells.

## Related

-   [Work packages](https://support.sitedrive.com/en/kb/work-packages)
-   [Moving and editing work](https://support.sitedrive.com/en/kb/moving-and-editing-work)
-   [Define areas: putting work into locations](https://support.sitedrive.com/en/kb/define-areas)
-   [Schedule settings](https://support.sitedrive.com/en/kb/schedule-settings)
